Last updated: October 2026
An ITP you have already built on one project is usually most of the way to the ITP for the next. FirmWork can copy it across: a whole ITP, several, or just the sections and tasks you need, either as new ITPs or added to an ITP the project already has.
Where to start
- On a project you already have: open the ITPs tab and click Copy from another project on the toolbar (it is also offered on an empty ITP register).
- When you create a project: choose Create from template, pick the project to copy settings from, and tick ITPs. The same choices appear in the template screen, and the ITPs are copied when the project is created.
1. Choose what to copy
Pick the project to copy from. Its ITPs are listed in the same order and numbering as on that project's ITP screen, each with its number, revision and task count.
- Whole ITPs: tick the ITP. Use All or None to tick or clear the lot.
- Part of an ITP: click Choose tasks on the ITP to see its sections and tasks, numbered as on the original (for example 2.1 Earthworks, 2.1.3 Proof roll). Tick a section to take all of its tasks, or tick single tasks. An ITP copied in part shows a part-ticked box and, for example, 2 of 5 tasks.
2. Choose where they go
Under Put them:
- As new ITPs in this project — each ITP you picked becomes a new ITP here, with its title, number and either its revision or Rev A (see below). If you picked only some of its tasks, the new ITP holds just those.
- Add to an existing ITP — the tasks are added to one of this project's ITPs:
- They go after its last task, in their original order.
- They keep their section names. If that ITP already has a section with the same name, they join it; otherwise a new section is added at the end.
- If a task has a Hold or Witness point for a party the ITP does not show yet (say, the Client), that sign-off column is added, so no hold point is lost.
- The ITP's title, number and revision stay as they are.
- A locked ITP cannot be chosen. Unlock it first if you need to add to it.
3. Choose whose names come across
Names to bring across lists each sign-off party the chosen ITPs use (Head Contractor, Client, Subcontractor and so on) with the people named on it.
- A party you are named on is ticked for you, so your own company's approvers travel with the ITP.
- Everyone else is left behind by default: the client, consultants and subcontractors are usually different on the next job. Their columns still come across, with nobody named, ready for this project's people.
- Tick or untick any party to change that. People added to a party here never remove anyone already named on it in this project.
4. Choose the revision (new ITPs only)
New ITPs can keep each ITP's latest revision (the default) or start at Rev A. When you add tasks to an existing ITP there is no revision choice: its revision is left alone.
What comes across
| Copied | Not copied |
|---|---|
|
Tasks and their text: activity, acceptance criteria, verification, frequency, references Sections and task order Sign-off columns and each cell's Hold / Witness point Approvers, for the parties you ticked |
Signatures and sign-off status (every task starts as Draft) Comments, photos and files Due dates and assignees Links to the old project's drawings and documents Share links |
Sign-off parties and Hold / Witness types are matched by name. If this project already has a party called Client, copied Client cells use it; if not, it is created.
Checking references for the new site
References and acceptance criteria are copied as they were, because most of them still apply. Some will not: a state's building legislation, a road authority's specification, or a council requirement can change from one job to the next. So a copied ITP is flagged with a banner on the ITP screen until someone checks it, for example "Concrete Works was copied from Perth Tower. Check its references and acceptance criteria for this site." (or "has tasks copied from" when only part came across).
- Mark checked clears the banner once you are happy with them.
- Check with AI reads each task's reference and acceptance criteria against this project's address and suggests the local equivalent where one is tied to the old location. Standards that apply in both places are normally left as they are.
- If the project has no address yet, type where the job is.
- Each suggestion shows the current text beside the suggested text, with the reason. Nothing changes until you tick it and click Apply.
- Suggestions the AI is unsure of start unticked and are marked to check. It will not invent clause numbers; where it knows the document but not the clause, it says so.
- Tasks that have moved on from Draft (for example once someone has signed) are shown but cannot be changed here.
- It uses AI credits, charged for every 60 tasks checked.
Who can copy
You need to be able to edit ITPs on the project you are copying into, and to see all of the ITPs on the project you are copying from. People who can only view a project, or who see only the ITP tasks assigned to them, do not get the Copy from another project button or the banner.